Casa Construction
Home Products Ground Up Engineering Staff Links Forum Contact Us
 
Construction Trades/Topics

0.0 Basic English and Spanish for       Construction ~ Ingles y Español       Básico para Construcción

Construction Planning and Design

1.0 Land and Site Planning ~       Planeación de Tierra y Sitio

2.0 Surveying ~ Agrimensura

3.0 Architectural Design ~ Diseño       Arquitectónico

4.0 Permits and Building Codes ~       Permisos y Códigos de       Construcción

Utilities

5.0 Septic System and Sewer ~       Sistema Séptico y Cloacas

6.0 Water System ~ Sistema de Agua

7.0 Shallow Utility Connections ~       Conexiones de Servicios Poco       Profundos

Exterior Construction

  8.0 Foundations and Concrete ~         Fundaciones y Concreto

  9.0 Framing ~ Enmarcado

10.0 Roofing ~ Techado

11.0 Masonry ~ Albañilería

12.0 Exterior Facades ~ Fachadas         Exteriores

13.0 Exterior Finishing ~ Terminación         de Exteriores

14.0 Landscaping ~ Paisajismo,         Jardinería

Interior Construction

15.0 Electrical Wiring ~ Cableado         Eléctrico

16.0 Low Voltage Electrical Wiring ~         Cableado Eléctrico de Baja         tensión

17.0 HVAC Heating, Ventilating, Air         Conditioning ~ HVAC Calefacción,         Ventilación, Aire Acondicionado

18.0 Plumbing ~ Plomería

19.0 Insulation ~ Aislamiento

20.0 Drywall and Other Interior Wall         Coverings ~ Drywall y otros         revestimientos interiores

21.0 Finished Carpentry ~ Carpintería         de terminación

22.0 Cabinets ~ Gabinetes

23.0 Interior Finishing ~ Terminación         de Interiores

24.0 Finished Flooring ~ Terminación         de Pisos

Management and Safety

25.0 Construction Management ~         Gestión de la Construcción

26.0 Construction Safety ~ Seguridad         en la Construcción

Turning a Curb-Stop valve on a water service.

A submersible pump ready to be lowered down a water well.

A worker repairs a valve on a city water line.

A fire hydrant is installed on a municipal water main line.

A typical water manhole.

Preparing a water well drilling machine ~ Preparando una mquina de perforacin de pozos de agua

Click on the phrase to hear the audio clip.
Haga clic en la palabra para oir la pronunciación

Key WordsPalabras Clave
01. Well01. Pozo
02. Pipe02. Tuberia, Caneria
03. Pump03. Bomba
04. Water Storage Tank04. Tanque de Almacenamiento de Agua
05. Water Main Line05. Linea Principal de Agua
06. Water Service06. Servicio de Agua
07. Valve07. Valvula
08. Pressure08. Presion
09. Connection09. Conexion
10. Water Treatment10. Tratamiento de Agua
11. To Contaminate11. Contaminar
12. To Pump12. Bombear
13. To drill13. Perforar
14. Groundwater14. Aguas Subterraneas

Useful PhrasesFrases Utiles
01. Can we use this water.01. Podemos usar este agua.
02. When will the water be turned on.02. Cuando estara conectada el agua.
03. Where is the Water service line located.03. Donde esta ubicada la linea de Servicio de Agua.
04. Where do you think is the best location to drill a well.04. Donde crees que es la mejor ubicacion para perforar un pozo.
05. When will the well be completed.05. Cuando estara el pozo completo.
06. You need to have the water connected before continuing.06. Usted necesita tener el agua conectada antes de continuar.
07. Backfill, this water pipe.07. Rellene esta caneria de agua.
08. There is a leak in the water system.08. Hay un goteo en el sistema de agua.
09. Insulate the pipe to prevent it from freezing.09. Aisle la tuberia para prevenirla de congelarse.
10. Turn on the water.10. Conecte el agua.


Current Forum Topics on this Subject ~ Mensajes más recientes sobre este tema:
Be the first to post on this topic! ~ Sé el primero en publicar sobre este tema!